CONTROLLED PRODUCT CONFIGURATION
Configure CVCD from order to production.
One application for Designer, Production, QC and Admin with controlled engineering release.
Current Work Order
—
PRODUCT CONFIGURATOR
New CVCD Item
NEW
Product Parameters
Advanced Designer
Override material or thickness independently by part. Any non-validated baseline is automatically held for engineering review.
P001 Frame Piece StrategyAUTO recommendation —
Selected —
P001Frame
P004Landing Angle
P007Blade
P009Side Linkage
Live Product Preview
SCHEMATICRelease Intelligence
Current locked interface rule
N = MAX(2, ROUNDUP((W-40)/150)+1)
CD = (W-39.4)/(N-1)
ORDER CONTROL
Work Order Items
PRODUCT RELATIONSHIP VIEW
CVCD Assembly
SELECT ITEM
Released Hold/Candidate
Interactive Assembly Relationship
Spatial relationship schematic — fabrication geometry remains controlled by the DXF view.
Select an item from Work Order.
Assembly Parts
Interfaces
Assembly Dimensions & Rules
PARAMETRICGENERATED ENGINEERING GEOMETRY
Item Engineering Detail
SELECT ITEM
Parts
ACTUAL GENERATORSelect an item from the Work Order screen.
DXF Geometry
Choose a part to preview.
Engineering Summary
FIXED · VARIABLE · DERIVEDMATERIAL OUTPUT
Consolidated BOM & Part Matrix
Selected Item Part Detail
Select an item from Work Order to inspect its parts.
MVP RELEASE CONTROL
Verification Center
NOT RUN
Verified Source Work Orders
CP1 INPUT
Loads the controlled 81 / 149 / 118 damper pilot data.
CP1 → CP6 Checkpoint Matrix
A downstream PASS never cancels an upstream HOLD.
DXF Visual Review
GREEN ORIGINAL · RED GENERATEDSelect “Overlay” on an eligible one-blade line.
CP6 Human Release
HUMAN ONLYAI Advisory
AI may return PASS / FLAG / UNCERTAIN, but cannot alter CP1–CP6 or approve manufacturing.
AI may return PASS / FLAG / UNCERTAIN, but cannot alter CP1–CP6 or approve manufacturing.
MANUFACTURING RESULTS
Production Control
—
Manufacturing Groups
0 GROUPSDXF Preview
Select a manufacturing group.
Item Release Matrix
P001 · P004 · P007 · P009V1.1 PILOT ENGINEERING OUTPUT
Generate Validated 3-WO Package
Available only when the selected Work Order exactly matches the controlled v1.1.0 source. Includes P001/P004/P007/P009/P010. This does not grant CP6 manufacturing release.
CONTROLLED OUTPUT
Prepare Production Package
Released and HOLD geometry will be physically separated.
BULK CONFIGURATION
Import Order Lines
Required columns: ItemNo, Width, Height, Material, Quantity, Depth, Flange. Locked values are never silently normalized.
Activity